Starting Soon

Project / Waste & Industrial / Setting Out

Bacup Waste
Transfer Station.

Brookes Geospatial will shortly commence construction setting-out support for the new Waste Transfer Station at Futures Park in Bacup, Lancashire.

Bacup, LancashireConstruction Setting OutSite Engineering
Explore the project ↓
ProjectWaste Transfer Station
LocationFutures Park, Bacup
ServiceConstruction Setting Out
SectorWaste / Industrial
Project statusStarting Soon

The project

Setting out the next phase
at Futures Park.

Brookes Geospatial will soon begin setting-out and site engineering support for the Waste Transfer Station development at Futures Park in Bacup.

Our role will be to transfer coordinated design information accurately onto the ground, supporting the construction team with positions, levels and survey control as the works progress.

The project adds to our growing portfolio of construction setting out across Bacup, Rossendale and Lancashire, supporting contractors with accurate engineering survey information throughout live construction programmes.

Waste Transfer Station project at Futures Park in Bacup, Lancashire
01

Futures Park, Bacup — Waste Transfer Station project

Project context

A new facility.
Accurate control from day one.

The new Waste Transfer Station is planned for Futures Park in Bacup as part of Rossendale's future waste infrastructure.

Rossendale Borough Council has described the development as a purpose-built indoor facility intended to support changing waste-handling requirements, with measures including fire suppression, odour control and carbon filtration.

Brookes Geospatial's involvement will focus on the construction phase, providing precise setting-out and engineering survey support as the project moves onto site.

Planned site support

From control to construction setting out.

Swipe through the workflow →

01

Design review

Construction information will be reviewed and coordinated before setting-out data is prepared for site use.

02

Survey control

A reliable control framework will provide a consistent spatial reference for engineering works across the development.

03

Site establishment

Key positions and levels will be transferred accurately from the coordinated design information onto the live site.

04

Construction setting out

Setting-out support will assist the site team as structural, civil and external works progress through the programme.

05

Level & position checks

Engineering checks can be undertaken as required to help maintain control, accuracy and consistency during construction.

06

Ongoing support

This project page will develop alongside the works, documenting setting-out activity and key construction milestones.

Starting soon

Ready for site.
Built to follow the project.

Brookes Geospatial is preparing to support the Bacup Waste Transfer Station project through its construction phase.

As works begin, this page will be updated with site photographs, engineering activity and examples of the setting-out work delivered on the project.

For contractors requiring a setting-out engineer in Bacup, Rossendale or across Lancashire, our team provides accurate site engineering support from project control through to construction delivery.

BacupRossendale, Lancashire
1dedicated setting-out partner
Soonconstruction support begins

Engineering support

Accurate setting out for live construction.

Our work at Futures Park will form part of Brookes Geospatial's wider construction setting-out and engineering survey service across Lancashire.

01
Construction Setting Out

Accurate transfer of coordinated design positions onto the live construction site.

02
Survey Control

Establishment and use of a reliable site control framework for consistent engineering work.

03
Levels & Datums

Precise level transfer and checks to support construction against project design information.

04
Position Checks

Survey checks to support quality control and confirm construction positions where required.

05
Engineering Survey Support

Responsive surveying input for site teams throughout the active construction programme.

06
Ongoing Site Support

Continued engineering assistance as the Waste Transfer Station progresses through construction.

Start a project

Need a setting-out engineer for your next construction project?

Request a quotation ↗