Project / Northallerton / Drainage Adoption
Drainage Adoption.
Northallerton.
A targeted as-built drainage survey recording foul and surface water infrastructure, chamber information and surrounding site levels to support the adoption process.
Explore the project ↓The project
What was installed.
Where it was installed.
Brookes Geospatial completed a targeted drainage adoption survey in Northallerton, North Yorkshire, providing an accurate record of the installed drainage network.
The survey recorded relevant chamber positions, cover and invert levels, pipework, drainage connections and surrounding surface information so the completed installation could be represented clearly within a coordinated as-built drawing.
Both foul and surface water drainage were incorporated into the survey, with the finished CAD drawing showing the network in context with kerbs, carriageway features, boundaries and surveyed site levels.
Below ground
Measured, checked
and documented.
Adoption survey information needs to reflect the drainage infrastructure that is physically present on site.
Chamber observations were recorded alongside measured positions and levels, giving the final drawing both spatial accuracy and useful engineering context.
Site photography provides a visual record of chamber layouts and connections, while the CAD survey brings the individual observations together into one coordinated dataset.
Survey workflow
From chamber inspection
to coordinated CAD.
Scope review
The required drainage extent and adoption information were confirmed before fieldwork.
Field survey
Drainage features and surrounding site detail were surveyed within a consistent control framework.
Chamber data
Relevant cover levels, invert levels, pipe sizes, connections and chamber observations were recorded.
CAD production
The measured information was coordinated into a clear as-built drainage drawing for onward project use.
Survey output
One coordinated
drainage record.
The finished survey combines drainage information with relevant topographical detail, helping the network be understood in relation to the completed highway and surrounding site.
The survey
Drainage data in
its site context.
The drawing provides more than a series of chamber coordinates. It records how the drainage network relates to the surrounding constructed environment.
Surface water and foul drainage are differentiated within the CAD output, with chamber references, level information and pipe data shown alongside kerbs, carriageway edges and surveyed ground levels.
This produces a practical as-built record that can be used alongside the wider technical documentation required during drainage adoption and project handover.
Site observations
Inside the network.
Field record
Chamber photography can be supplied alongside measured drainage information to provide a clear visual reference for the surveyed network.
Survey information
What we can
record.
The survey scope can be tailored to the information required by the client, contractor, consultant or adopting authority.
Accurate surveyed locations tied into the wider site record.
Cover levels recorded as part of the chamber survey information.
Measured invert information used to describe the drainage network vertically.
Relevant pipe diameters and chamber connections represented within the survey data.
Separate drainage systems clearly differentiated within the CAD output.
Kerbs, highway features, boundaries and levels added where required for context.
A useful visual record of chamber arrangements and connections.
A coordinated drawing prepared for onward design, handover and adoption use.
Additional capability
CCTV drainage
inspection available.
Where survey information alone is not enough, CCTV inspection can be provided alongside the measured drainage survey.
This can help verify internal pipe condition, investigate defects and provide additional evidence of connections — giving the project team a more complete record of the network.
Discuss your drainage requirements ↗The result
A clear record of
the installed network.
The completed survey gives the project team a measured drainage record based on what was present on site at the time of survey.
Combining drainage information, chamber observations and surrounding topographical detail makes the final drawing easier to interpret and more useful for adoption and handover.